Mini Hydropower
Lubu 1
Pasaman, West Sumatra
01 / 07Project overview
A 10 MW mini-hydropower project planned within a two-project cascade on the Batang Lubu River.
LocationPasaman, West Sumatra
Energy sourceHydropower
Portfolio contextBatang Lubu River
- Generation capacity
- 10.00 MW
- Turbine installation
- 2 × 5.00 MW Francis, horizontal shaft
- Net head
- 119 m
- Catchment area
- Approximately 155.65 km²
- Annual mean rainfall
- 3,000 mm/year
- Annual average discharge
- 13.95 m³/s
- Plant discharge range
- 1.88–9.38 m³/s
- Waterway
- 3.051 km
- Design flood discharge
- 705.11 m³/s (50-year); 799.18 m³/s (100-year)
Development approach
Clear decisions from site understanding to lifecycle performance.
Ombilin Power approaches each opportunity as a connected system. Resource, terrain, technical interfaces, safety, local context and future operations must be understood together.
Detailed project capacity, programme and operating data are shared through direct, authorised project discussions.
Request project information →Start a conversation