Mini Hydropower
Lubu 2
Pasaman, West Sumatra
02 / 07Project overview
A 10 MW mini-hydropower project forming the second stage of the planned Batang Lubu cascade.
LocationPasaman, West Sumatra
Energy sourceHydropower
Portfolio contextBatang Lubu River
- Generation capacity
- 10.00 MW
- Turbine installation
- 2 × 5.00 MW Francis, horizontal shaft
- Net head
- 145 m
- Catchment area
- Approximately 160.43 km²
- Annual mean rainfall
- 3,000 mm/year
- Annual average discharge
- 14.27 m³/s
- Plant discharge range
- 1.55–7.73 m³/s
- Waterway
- 3.5 km
- Design flood discharge
- 726.76 m³/s (50-year); 823.72 m³/s (100-year)
Development approach
Clear decisions from site understanding to lifecycle performance.
Ombilin Power approaches each opportunity as a connected system. Resource, terrain, technical interfaces, safety, local context and future operations must be understood together.
Detailed project capacity, programme and operating data are shared through direct, authorised project discussions.
Request project information →Start a conversation
Let’s build what endures.
Talk with our team about renewable power, project development and long-term partnership.